Project:
Site Wide BAS Upgrade – Crown Melbourne
Role:
Client Representative, Design Manager, Project Manager and Superintendent. Responsible for design, documentation and delivery of the BAS upgrade.
Client:
Crown Melbourne
Partners:
SUMMARY
The Crown BAS Upgrade was developed as a 5 year master plan to upgrade and future proof the complete system after 15 years of site operation. This included the installation of a new Ethernet which would allow the system to operate on a virtual network in lieu of a typical cable network.
WORKS INCLUDED
Preparation, review and sign-off of Front End Engineering Document (FEED)
Installation of a new 2.2km Ethernet that interconnects to all data hubs located within the complex;
Installation of new data gathering panels and cutting over of existing system onto the new Ethernet;
Cutovers and testing between existing and new controllers;
Development of new functional description and control strategies to incorporate an energy reduction masterplan.
CHALLENGES
Cut-overs and works taking place in 24 / 7 facility.
Testing of plant and equipment in an operational facility.
Operating partially cut-over systems
CONTACT US
Specialised Project Management Group
Level 12, 412 St Kilda Rd
Melbourne VIC 3004
CONNECT
Specialised Management Group
MORE INFORMATION
Send us a message via our
contact form here