SUMMARY
Responsible for feasibility, design, documentation and delivery of the upgrade of the existing air cooled Chiller Plant for Crown’s Clarke Street Building. The plant had been operational 24 hours a day, 7 days a week since the complex opened and was at the end of its economically usable life.
WORKS INCLUDED
Conduct feasibility of existing plant, assess options, prepare budget and recommend replacement works
Replace 2 x 1500Kw and 1 x 750Kw air cooled chillers that were past their economically usable life
Modification of the existing primary pumping system to a more efficient and reliable primary / secondary system
New controls system (BACnet – Comfortpoint)
Pump Room Built off site and lifted into position in-situ, pre-tested and commissioned
Modification to existing structural support systems.
CHALLENGES
Lifting of plant and equipment over Whiteman Street, Southbank
Cut-overs and works taking place in 24 / 7 operational facility
Handling of Plant and equipment with significant weight
Modifications to primary pumping system
The Project featured in The Official Journal of AIRAH – Ecolibrium, July 2010
CONTACT US
Specialised Project Management Group
Level 12, 412 St Kilda Rd
Melbourne VIC 3004
CONNECT
Specialised Management Group
MORE INFORMATION
Send us a message via our
contact form here