Project:
Gas Suppression System Roll-out
Role:
Client Representative, Design Manager and Project Manager.
Client:
Crown Melbourne
Partners:
Titan Fire
SUMMARY
Responsible for design, documentation and delivery of the Gas Suppression System Roll-out. After the successful construction of the new data Centre at Crown it was determined that to assist with business continuity and system reliability that all critical data hubs were to be installed with Gas Suppression Systems.
WORKS INCLUDED
Inspection and audit of all data hubs throughout the complex prioritising the roll out
Interface with the existing fire control systems
Detailed design management of the installation of gas suppression systems in to
existing data hubs
Preparation of performance based briefing documents for contractor engagement
CHALLENGES
Technical installation of complex systems in to operational data hubs
Ensuring continuity of operation during the works
Training of in-house engineering staff
CONTACT US
Specialised Project Management Group
Level 12, 412 St Kilda Rd
Melbourne VIC 3004
CONNECT
Specialised Management Group
MORE INFORMATION
Send us a message via our
contact form here