SUMMARY
Responsible for design, documentation and delivery of a Honeywell/Siemens interface for Crown Towers, Level 39 to the complex wide head end. The project involved integrating the standalone Siemens BAS system on Level 39 of Crown Towers into Crowns site wide Honeywell BAS / EBI. The purpose of the works was to demonstrate the openness and integration ability of the protocols and create a competitive environment for future works.
WORKS INCLUDED
Prepare business case justification for works in order to apply for capital works expenditure to complete the project
Interface with the existing fire control systems
Use Honeywell design tools to replicate the Siemens interface on the Crown headend
CHALLENGES
Management and co-ordination of two high end BAS competitors
Ensuring continuity of operation during the works and post completion
Training of in-house engineering staff
CONTACT US
Specialised Project Management Group
Level 12, 412 St Kilda Rd
Melbourne VIC 3004
CONNECT
Specialised Management Group
MORE INFORMATION
Send us a message via our
contact form here