SUMMARY

Responsible for design, documentation and delivery of a Honeywell/Siemens interface for Crown Towers, Level 39 to the complex wide head end. The project involved integrating the standalone Siemens BAS system on Level 39 of Crown Towers into Crowns site wide Honeywell BAS / EBI. The purpose of the works was to demonstrate the openness and integration ability of the protocols and create a competitive environment for future works.

WORKS INCLUDED

Prepare business case justification for works in order to apply for capital works expenditure to complete the project

Interface with the existing fire control systems

Use Honeywell design tools to replicate the Siemens interface on the Crown headend

CHALLENGES

Management and co-ordination of two high end BAS competitors

Ensuring continuity of operation during the works and post completion