Project:
Hyatt Centric Hotel, Melbourne
Role:
Project Manager – Commissioning, Testing and Handover – Services and Infrastructure
Client:
Hickory
Partners:
Little Projects
SUMMARY
SPMG were engaged by Hickory during the last 6 months of the delivery phase of the project to oversee the co-ordination and integration of all services on the project. Hyatt Centric Melbourne features 280 guestrooms and a restaurant inspired by Melbourne’s local foodie scene. Interestingly the site is fully compatible with the “World of Hyatt” app. The app provides contactless digital check in and allows room preferences (lighting, temperature etc) to be updated before arrival.
WORKS INCLUDED
Client interface and project coordination meetings
Management and reporting on of all commissioning to suit ESD requirements
Lead Commissioning, integration and Testing meetings
Overseeing all trades and managing the interface of all services into a converged IT network
Design and Engineering advice during completion and coordination
CHALLENGES
To allow operation of this system a Converged Network was installed within the site connecting >1500 devices. Co-ordination of this system along with commissioning management of Mechanical (BAS), Electrical, Comms, Security, Hydraulics, Fire and Lifts was also completed in conjunction with Hyatt and the building owner Little Projects
CONTACT US
Specialised Project Management Group
Level 12, 412 St Kilda Rd
Melbourne VIC 3004
CONNECT
Specialised Management Group
MORE INFORMATION
Send us a message via our
contact form here